Devices/Energy monitoring nodes
works with InfiIoT · certified partner

Energy monitoring nodes

Panel and feeder monitoring, with SenseIoT NILM where appliance-level estimates are needed.

Energy monitoring nodes
3-phase
panel + feeder
NILM
appliance-level (SenseIoT)
kWh→CO₂
board-ready reporting
Energy monitoring nodes
[ Detail / port view ]
[ Installed on-site ]
Overview

Certified-partner nodes provide panel- and feeder-level energy monitoring across a library of meter protocols. They complement the SenseIoT NILM node, which estimates appliance-level loads from the distribution panel. Both feed the same energy model for consumption, baselines, anomalies, and kWh-to-CO₂ conversion.

Specifications

representative · class-level
MeteringPanel- and feeder-level, 3-phase
Protocol libraryBroad energy-meter coverage
NILMSenseIoT non-intrusive load monitoring
OutputsConsumption, baselines, anomalies, CO₂
ControlLoad control, occupancy scheduling
CommsRS485 / Modbus, MQTT to InfiIoT
Deployment scenarios

Where this class earns its place.

Attribute energy changes to a feeder or load
For the CFO

Attribute energy changes to a feeder or load

Per-feeder and NILM breakdowns can identify where, when, and by how much consumption changed.

Calculate CO₂ from measured consumption
For the sustainability officer

Calculate CO₂ from measured consumption

kWh-to-CO₂ conversion uses metered energy rather than estimates, with the underlying readings retained for review.

Schedule HVAC and lighting from occupancy
For the facilities head

Schedule HVAC and lighting from occupancy

Occupancy-driven controls reduce overnight consumption without relying on staff to switch systems manually.

Works with InfiIoT

The protocol, variable mapping, and platform handshake have already been tested.

3-phase meteringmeter-protocol libraryNILM (SenseIoT)kWh → CO₂load control
Connected-product assessment

Bring one product. Leave with a clear next step.

Use 30 minutes to test the fit around one product and one blocked decision. If there is a fit, we will outline the two-week Product Blueprint.

30-minute fit callOne productNo prepared deck