Integrations/SAP Plant Maintenance
shippedEnterprise asset management

SAP Plant Maintenance

Condition data becomes an SAP PM notification with the supporting evidence attached.

What it is

A useful prediction must create maintenance work. This connector maps an InfiIoT twin to SAP equipment, then raises a PM notification when a condition rule crosses its threshold. The sensor evidence travels with it, and work-order status returns to the asset timeline.

OData / BAPIfunctional-location mappingauto work ordersevidence attachments
SAP Plant Maintenance
How it works

The data path, including the hand-offs that usually cause trouble.

01

Map assets

Map each InfiIoT twin to its SAP functional location and equipment record, then maintain that relationship as assets change.

02

Trigger

The rules engine fires on condition thresholds: temperature trends, vibration signatures, runtime hours.

03

Create the order

An OData/BAPI call raises the PM notification or work order, with the triggering telemetry attached as evidence.

04

Close the loop

Return work-order status to the twin timeline so detection, dispatch, and resolution remain in the asset history.

Top use cases

Where teams use this integration.

For the maintenance head

Create a work order from the condition signal

A transformer temperature trend can raise an SAP PM notification with the supporting readings attached.

For the reliability manager

Track the shift toward planned work

Condition-based triggers identify which emergency orders could have been scheduled and how maintenance cost changes by asset.

For the CIO

Keep SAP PM as the maintenance system of record

Orders, spares, costing, and audit history remain in SAP PM rather than being duplicated in an IoT backlog.

Want this wired into your stack?

Bring the source system, target system, and security constraints. An engineer will map the interface and the unresolved questions.

Connected-product assessment

Bring one product. Leave with a clear next step.

Use 30 minutes to test the fit around one product and one blocked decision. If there is a fit, we will outline the two-week Product Blueprint.

30-minute fit callOne productNo prepared deck