Solutions/Utilities & infrastructure
shippedWater, gas & utilities

Utilities & infrastructure

Reservoirs, pump houses, gas lines, and feeders are geographically scattered and often instrumented in isolation. Routine gauge readings still require travel, while leaks and outages can develop between visits.

Field
Level, flow, pressure & gas sensing + RTU
Connectivity
4G / LoRa from remote sites
Platform
InfiIoT single pane + alerting
Outcome
Exception-based ops, fewer site visits
One accountable stack

We specify the field hardware and the software around the same asset model, with one engineering team responsible for the result.

The hardware, specifiedIndia-first · certified · locally supported
Level / flow / pressure transmitters

Level / flow / pressure transmitters

Measure the physical state of the network

Radar & ultrasonic level, electromagnetic flowPressure transmitters, 4–20 mA / ModbusIP68 field-rated
Why thisIndia-made instruments keep spares, calibration, and AMC support in-country.
Remote RTU + cellular / VPN gateway

Remote RTU + cellular / VPN gateway

Connects an unmanned site over an encrypted path

DI/AI aggregation, edge logic4G with IPsec/OpenVPNSMS fallback + store-and-forward
Why thisOutbound VPN connectivity avoids exposing an inbound telemetry service on the public internet.
NB-IoT / ultrasonic gas & water meter

NB-IoT / ultrasonic gas & water meter

Consumption and distribution truth

NB-IoT smart meter, tamper detectionRemote valve on gas/waterLong battery life
Why thisProven in a live smart gas-metering deployment on Indian networks.
The InfiIoT software layer

What the platform does with all that hardware data.

Network operating view

Reservoirs, pumps, feeders, and meters appear on one map with their current state and last update time.

Leak, level & outage alerts

Threshold and rate-of-change rules catch leaks and dry-runs early, routed to the on-call engineer instantly.

Remote control & scheduling

Operators schedule pumps and valves from the console, with field attendance reserved for maintenance and exceptions.

Compliance & operations reports

Supply hours, consumption, and event logs generated on schedule for the board and the regulator.

What the decision maker gets
one map
all scattered assets
early
leak & dry-run alerts
↓ visits
exception-based ops

Hardware and software, one proposal.

Bring the asset, interfaces, and operating constraint. We will map the likely bill of materials and the first platform workflow.

Connected-product assessment

Bring one product. Leave with a clear next step.

Use 30 minutes to test the fit around one product and one blocked decision. If there is a fit, we will outline the two-week Product Blueprint.

30-minute fit callOne productNo prepared deck